New Durham Home Base Page | Back to Family Home Page
|
Renovation Progress 01/27/17
|
|
Sue and I went up to our new home today, Friday 01/27/17, to check on the renovation work. Our contractor Steve had told us that he had the stairs all ripped out, and we really wanted to see what that looked like.
To celebrate this final major part of the demolition phase of the renovation work, Sue made up a super batch of chili for him and Art.
Next up will be to frame in the new stairs. They will have much more managable 7 1/4 inch risers as opposed to the current 9 inchs.
|
Looking toward the street in what will be the library. The next picture will be looking out from the library through the door you see on the right of this picture.
|
Looking out of the library through the main entry hall into the living room.
|
Main living and dining room. The space on the far side is where the 2 bedrooms were previously located.
|
Main living and dining room. The space on the far side is where the 2 bedrooms were previously located.
|
New Durham Home Base Page | Back to Family Home Page
|